Sulzer Nuclear Power Plant Thermal Shock Test
In 2021, jointly design and build the thermal shock test project of the main feed water pump of the nuclear power plant with Suzhou Sulzer. The water temperature will rise rapidly from below 40°C to 185°C within 3s.