Recently, the thermal shock test project of the main feed water pump of the nuclear power plant that POWERFLOW Control Co., Ltd participated in the design and construction has been a complete success. The test results have won unanimous praise from the Sulzer and the end user.。
The thermal shock project was completed on the basis of the high temperature and high pressure boiler feed water pump test bench supplied to Sulzer in 2014 by our company. During the start of the test main pump, the water temperature rose rapidly from below 40°C to 185°C within 3s, and continued to run at this high temperature, far exceeding the established target of 15s. After on-site testing by our customer as well as the experts of the acceptance team, they unanimously agreed to pass the acceptance.
Sulzer founded in 1834, it is a global leader in pumps, surface treatment technology, chemical machinery, and turbine services. The successful cooperation with Sulzer again marks that POWERFLOW's nuclear pump testing capability has reached a new level. All our company employees will always adhere to the concept of seeking truth from facts and excellence, and continue to provide customers with first-class products and services.